It is possible that your kit(s) will not be delivered by the estimated lead time.When ordering a kit, you need to be aware that: Lead times on all kits are estimates only. Important: We have refactored our manufacturing and procurement operations to better meet the higher demand we’ve recently experienced. Price difference is between IO360/390A vs. Preview Plans (required purchase before beginning construction) Kit prices effective: March 6, 2023, 3:00 pm, Pacific Time Shipping/freight remains an additional charge, and is determined at the time the kit ships. All crating and handling costs are now included in the kit price regardless of method of delivery. Note that for kits ordered starting March 6, 2023, Van’s no longer charges a separate crating fee. In addition, if we experience significant third-party cost increases between the time an order is received and the time it is to be shipped, we may have to revise the price for a kit accordingly. Customer-initiated delays will result in price adjustments if kit prices have changed since the initial order was received. Prices charged are those in effect at the time we receive your deposit and will be reflected on your invoice. We maintain the current kit prices below for your reference. We work hard to make things predictable and maintain prices as low as we can for you, but prices and lead times are subject to change at any time and without notice.īuilders of RV-3, RV-4 and RV-6 kits should read the Van’s Aircraft letter published in December 2017 regarding production timing, lead times, and prices for those kits. Please visit the Order a Kit page to access our kit order forms. The prices below do not include shipping charges. The QuickBuild price includes the empennage kit, QB wing kit, QB fuselage kit, and the finishing kit. For the RV-12iS model only, the “kit total” price listed also includes powerplant and avionics kits. The “kit total” prices listed below include the empennage, wing, fuselage, and finishing kits. You must take delivery of the order as soon as it is ready, and any customer-initiated delays in delivery will result in the kit price being adjusted to the price effective on the date of the change. When you order a kit(s) from us, you’re creating an order which will be produced and delivered to you as soon as we are able. We do our best to estimate timeframes and keep you up to date, but please understand that the numbers below are estimates and are subject to change at any time. Variables in the supply chain, manufacturing, shipping, and order volume logistics can – and in the current environment often do – cause delivery timetables to shift, sometimes significantly. Important: The estimated lead times displayed below are our best projection at any point in time as to how long from the time of order before a kit will be ready to a) crate at Van’s and then b) ship to the customer. Below you will find the current prices and the estimated availability lead times of our aircraft kits as well as other items with longer lead times such as engines and propellers.
0 Comments
Leave a Reply. |